Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 8 of 8 results
-
What if there is a gap in coverage of the GLEJGP?
EPA has set up national technical assistance centers (TCTACs), including one solely for tribes and tribal nations, that are geared towards communities. There are two in Region 5: one in Minneapolis and one in Chicago. The TCTACs are separate from this RFA ; however, they cover the entire Great Lakes…
- Last published:
-
Does EPA have a minimum threshold/definition for the Regional scale program? In other words, what does Regional mean or is it open to applicants to determine at any scale?
GLNPO wants to be extremely flexible and encourage PRs to think about which regions they could expect to effectively cover when creating their application. There are no additional criteria from EPA on how big or small the Project RFA should be.
- Last published:
-
When will construction begin in the Silver-Bow Creek Corridor?
Construction in the Silver Bow Creek corridor began in 2024 with the Grove Gulch Project.
- Last published:
-
Could a regional application, include an entire state?
Yes, with the caveat that the entire state must fall within the historic bounds of the Great Lakes basin. For example, if the Principal Recipient is proposing a GLEJGP for the state of Illinois, projects may fall in the portion of the state within the Great Lakes basin, but not…
- Last published:
-
How will waste from the Further Remedial Elements project (Silver Bow Creek Corridor) areas be handled?
Each Further Remedial Element project area has its own specific requirements regarding waste. For example, at Northside Tailings and Diggings East, all materials within the project area that exceed the Waste Identification Criteria will be disposed of offsite in a repository. At Buffalo Gulch all materials below the basin(s) that…
- Last published:
-
Does funding through this grant include municipalities within the Chicago River watershed?
Yes, including the historic Chicago River watershed.
- Last published:
-
Will basin wide PR serve areas without a designated PR for smaller part of the region, or will their service areas overlap?
If the Project RFA will be serving the entire basin, I.e., a basin-wide GLEJGP, this could be delegated within a coalition (if it is a coalition that has applied). Otherwise, the PR organization will be serving the entire basin. If there is a basin-wide PR as well as a smaller…
- Last published:
-
Is there guidance in the application pertaining to any QAPP (Quality Assurance Project Plan) requirements for the individual projects and associated subrecipients?
Quality Assurance (QA) information is provided in the RFA document under Section VI.B. However, once awards are made, EPA will provide additional guidance and support to the principal recipient on QA and QAPP(s) as necessary.
- Last published: