Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 33
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 61
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 8 of 8 results
-
Does EPA have a minimum threshold/definition for the Regional scale program? In other words, what does Regional mean or is it open to applicants to determine at any scale?
GLNPO wants to be extremely flexible and encourage PRs to think about which regions they could expect to effectively cover when creating their application. There are no additional criteria from EPA on how big or small the Project RFA should be.
- Last published:
-
Where can I go to learn more?
PitWatch.org is the online home of the Berkeley Pit Public Education Committee. This volunteer committee educates residents, students, and the public about the environmental management of the Berkeley Pit. Information includes the geology, hydrology, current events, and ongoing academic research associated with the Berkeley Pit. This committee frequently shares their…
- Last published:
-
When will construction begin in the Silver-Bow Creek Corridor?
Construction in the Silver Bow Creek corridor began in 2024 with the Grove Gulch Project.
- Last published:
-
I am asking if the "Great Lakes" you are saying is the Great Lakes region of Africa.
No. This United States Environmental Protection Agency Great Lakes Restoration Initiative Notice of Funding Opportunity is referring to the North American Great Lakes.
- Last published:
-
How can I get involved?
EPA encourages the public to review our Community Involvement Plan (pdf) (66pp, 6MB) that lays out our specific community involvement activities, and how to become involved at the Site. You can also contact our Community Involvement Coordinator, Mackenzie Meter ( [email protected] ), for site updates and to be added to…
- Last published:
-
How will waste from the Further Remedial Elements project (Silver Bow Creek Corridor) areas be handled?
Each Further Remedial Element project area has its own specific requirements regarding waste. For example, at Northside Tailings and Diggings East, all materials within the project area that exceed the Waste Identification Criteria will be disposed of offsite in a repository. At Buffalo Gulch all materials below the basin(s) that…
- Last published:
-
Does funding through this grant include municipalities within the Chicago River watershed?
Yes, including the historic Chicago River watershed.
- Last published:
-
Will basin wide PR serve areas without a designated PR for smaller part of the region, or will their service areas overlap?
If the Project RFA will be serving the entire basin, I.e., a basin-wide GLEJGP, this could be delegated within a coalition (if it is a coalition that has applied). Otherwise, the PR organization will be serving the entire basin. If there is a basin-wide PR as well as a smaller…
- Last published: