Subpart VV Information Sheet
Overview
Subpart VV of the Greenhouse Gas Reporting Program (GHGRP) (40 CFR 98.480 – 98.489) applies to any facility that injects carbon dioxide (CO2) into the subsurface for enhanced recovery operations for oil and other hydrocarbons (CO2-EOR) and meets the Subpart VV source category definition. Some subparts have thresholds that determine applicability for reporting, and some do not. To decide whether your facility must report under this subpart, please refer to 40 CFR 98.481 and the GHGRP Applicability Tool.
This Information Sheet is intended to help facilities reporting under Subpart VV understand how the source category is defined, what greenhouse gases (GHGs) must be reported, how GHG emissions must be calculated and shared with EPA, and where to find more information.
On this page:
- How is This Source Category Defined?
- What GHGs Must Be Reported?
- How Must GHG Emissions Be Calculated?
- What Information Must Be Reported?
- What Records Must Be Maintained?
- When and How Must Reported Be Submitted?
- When Can a Facility Stop Reporting?
- For More Information
How is This Source Category Defined?
The Subpart VV source category pertains to facilities that:
- Inject carbon dioxide (CO2) underground for enhanced recovery operations for oil and other hydrocarbon (CO2-EOR ); and
- Use the International Standards Organization (ISO) standard designated as CSA/ANSI ISO 27916:19 (CO2 capture, transportation and geological storage—CO2-EOR) as a method of quantifying geologic sequestration (GS) of CO2 in association with EOR operations.
Facilities that engage in CO2-EOR projects and use the CSA/ANSI ISO 27916:19 standard as a method of quantifying GS of CO2 in association with EOR operations must report under Subpart VV; there is no threshold for reporting. The Subpart VV source category does not include facilities that are reporting under Subpart RR or that are permitted as Class VI under the Underground Injection Control (UIC) program. When a facility previously met the source category definition for Subpart UU for CO2-EOR projects, but then began using CSA/ANSI ISO 27916:19, the facility must report under Subpart UU for the portion of the year before using CSA/ANSI ISO 27916:19 and under Subpart VV for the portion of the year after using CSA/ANSI ISO 27916:19.
What GHGs Must Be Reported?
Under Subpart VV, facilities that engage in CO2-EOR projects must report the following from Clause 8 of CSA/ANSI ISO 27916:19:
- The mass of CO2 received by the CO2-EOR project.
- The mass of CO2 loss from the CO2-EOR project operations.
- The mass of native CO2 produced and captured.
- The mass of CO2 produced and sent off-site.
- The mass of CO2 loss from the EOR complex.
- The mass of CO2 stored in association with CO2-EOR.
If multiple Greenhouse Gas Reporting Program (GHGRP) source categories are co-located at a facility, the facility may also need to report greenhouse gas (GHG) emissions under one or more different subparts. Please refer to the relevant information sheet for a summary of the rule requirements for any other source categories located at the facility. Facilities that are subject to only Subpart VV are not required to report under Subpart C or any other subpart listed under 40 CFR 98.2(a)(1) or (2).
How Must GHG Emissions Be Calculated?
Under Subpart VV, facilities engaged in CO2-EOR projects must calculate CO2 sequestered using the following quantification principles from Clause 8.2 of CSA/ANSI ISO 27916:19:
- Use Equation 1 of VV to calculate the mass of CO2 stored in association with CO2-EOR (mstored) in the reporting year by subtracting the mass of CO2 loss from operations and the mass of CO2 loss from the EOR complex from the total mass of CO2 input:
- Equation 1 of VV: mstored = minput - mloss operation - mloss EOR complex
- mstored = The annual quantity of associated storage in metric tons of CO2 mass.
- minput = The total mass of CO2 mreceived by the EOR project plus mnative (see Clause 8.3 of CSA/ANSI ISO 27916:19 and paragraph (c) of this section), metric tons. Native CO2 produced and captured in the CO2-EOR project (mnative) can be quantified and included in minput.
- mloss operations = The total mass of CO2 loss from project operations (see Clauses 8.4.1 through 8.4.5 of CSA/ANSI ISO 27916:19 and paragraph (d) of this section), metric tons.
- mloss EOR complex = The total mass of CO2 loss from the EOR complex (see Clause 8.4.6 of CSA/ANSI ISO 27916:19), metric tons.
- The method used to quantify associated storage must assure completeness and preclude double counting. The annual mass of CO2 that is recycled and reinjected into the EOR complex must not be quantified as associated storage. Loss from the CO2 recycling facilities must be quantified.
- Quantify the total mass of CO2 input (minput) in the reporting year by completing the following:
- Include the total mass of CO2 received at the custody transfer meter by the CO2-EOR project (mreceived). The CO2 stream received (including CO2 transferred from another CO2-EOR project) must be metered.
- The native CO2 recovered and included as mnative must be documented.
- CO2 delivered to multiple CO2-EOR projects must be allocated among those CO2-EOR projects.
- The sum of the quantities of allocated CO2, which must not exceed the total quantities of CO2 received.
- Include the total mass of CO2 received at the custody transfer meter by the CO2-EOR project (mreceived). The CO2 stream received (including CO2 transferred from another CO2-EOR project) must be metered.
- Equation 1 of VV: mstored = minput - mloss operation - mloss EOR complex
- Use Equation 2 of VV to calculate the total mass of CO2 from project operations (mloss operation) in the reporting year:
- Equation 2 of VV: mloss operation = mloss leakage facilities + mloss vent/flare + mloss entrained + mloss transfer
- mloss leakage facilities = Loss of CO2 due to leakage from production, handling, and recycling CO2-EOR facilities (infrastructure including wellheads), metric tons.
- mloss vent/flare = Loss of CO2 from venting/flaring from production operations, metric tons.
- mloss entrained = Loss of CO2 due to entrainment within produced gas/oil/water when this CO2 is not separated and reinjected, metric tons.
- mloss transfer = Loss of CO2 due to any transfer of CO2 outside the CO2-EOR project, metric tons. Facilities must quantify any CO2that is subsequently produced from the EOR complex and transferred offsite.
- Use the applicable monitoring and quality assurance (QA) requirements set forth in Clause 6.2 of CSA/ANSI ISO 27916:19.
- Whenever the value of a parameter is unavailable or the QA procedures set forth in 40 CFR 98.484 cannot be followed, follow the procedures set forth in Clause 9.2 of CSA/ANSI ISO 27916:19.
- Equation 2 of VV: mloss operation = mloss leakage facilities + mloss vent/flare + mloss entrained + mloss transfer
A checklist for data that must be monitored is available here: Subpart VV Monitoring Checklist.
What Information Must Be Reported?
In addition to the information required by the General Provisions in Subpart A, found at 40 CFR 98.3(c), the following must be reported:
- The annual quantity of associated storage in metric tons of CO2 (mstored).
- The density of CO2 if volumetric units are converted to mass in order to be reported for annual quantity of CO2 stored.
- The annual quantity of CO2 input (minput) and:
- The annual total mass of CO2 received at the custody transfer meter by the CO2-EOR project, including CO2 transferred from another CO2-EOR project (mreceived); and
- The annual mass of native CO2produced and captured in the CO2-EOR project (mnative).
- The annual mass of CO2 that is recycled and reinjected into the EOR complex.
- The annual total mass of CO2 loss from project operations (mloss operation), and:
- Loss of CO2 due to leakage from production, handling, and recycling CO2-EOR facilities (infrastructure including wellheads) (mloss leakage facilities);
- Loss of CO2 from venting/flaring from production operations (mloss vent/flare);
- Loss of CO2due to entrainment within produced gas/oil/water when this CO2 is not separated and reinjected (mloss entrained); and
- Loss of CO2 due to any transfer of CO2 outside the CO2-EOR project (mloss transfer).
- The total mass of CO2 loss from the EOR complex (mloss EOR complex).
- Annual documentation that contains the following components as described in Clause 4.4 of CSA/ANSI ISO 27916:19:
- The formulas used to quantify the annual mass of associated storage, including the mass of CO2 delivered to the CO2-EOR project and losses during the period covered by the documentation (see Clause 8 and Annex B of CSA/ANSI ISO 27916:19).
- The methods used to estimate missing data and the amounts estimated as described in Clause 9.2 of CSA/ANSI ISO 27916:19).
- The approach and method for quantification utilized by the operator, including accuracy, precision, and uncertainties (see Clause 8 and Annex B of CSA/ANSI ISO 27916:19).
- A statement describing the nature of validation or verification including the date of review, process, findings, and responsible person or entity.
- Source of each CO2 stream quantified as associated storage (see Clause 8.3 of CSA/ANSI ISO 27916:19).
- A description of the procedures used to detect and characterize the total CO2 leakage from the EOR complex.
- If only the mass of anthropogenic CO2 is considered for mstored, a description of the derivation and application of anthropogenic CO2 allocation ratios for all the terms described in Clauses 8.1 to 8.4.6 of CSA/ANSI ISO 27916:19.
- Any documentation provided by a qualified independent engineer or geologist, who certifies that the documentation provided, including the mass balance calculations as well as information regarding monitoring and containment assurance, is accurate and complete.
- Any changes made within the reporting year to containment assurance and monitoring approaches and procedures in the EOR operations management plan.
EOR Operations Management Plan (OMP)
Facilities must submit an EOR OMP and initial documentation to the Administrator with the annual report for the first reporting year that the facility reports under Subpart VV. Any documentation provided by a qualified independent engineer or geologist, who certifies that the documentation provided is accurate and complete, must also be provided to the Administrator.
- EOR OMP: Facilities engaged in CO2-EOR projects must prepare and update, as necessary, a general EOR OMP that:
- Provides a description of the EOR complex and engineered system (see Clause 4.3(a) of CSA/ANSI ISO 27916:19);
- Establishes that the EOR complex is adequate to provide safe, long-term containment of CO2; and
- Includes site-specific and other information including:
- Geologic characterization of the EOR complex;
- A description of the facilities within the CO2-EOR project;
- A description of all wells and other engineered features in the CO2-EOR project;
- The operations history of the project reservoir; and
- The information set forth in Clauses 5 and 6 of CSA/ANSI ISO 27916:19.
- Initial Documentation: Facilities must also prepare initial documentation at the beginning of the quantification period, and include the following in the EOR OMP:
- A description of the EOR complex and engineered systems (see Clause 5 of CSA/ANSI ISO 27916:19);
- The initial containment assurance (see Clause 6.1.2 of CSA/ANSI ISO 27916:19);
- The monitoring program (see Clause 6.2 of CSA/ANSI ISO 27916:19);
- The quantification method to be used (see Clause 8 and Annex B of CSA/ANSI ISO 27916:19); and
- The total mass of previously injected CO2 (if any) within the EOR complex at the beginning of the CO2-EOR project (see Clause 8.5 and Annex B of CSA/ANSI ISO 27916:19).
If the EOR OMP is updated, the updated EOR management plan must be submitted to the Administrator with the annual report covering the first reporting year for which the updated EOR OMP is applicable.
What Records Must Be Maintained?
Reporters are required to retain records that pertain to their annual GHGRP report for at least three years after the date the report is submitted. Please see the Subpart A Information Sheet and 40 CFR § 98.3(g) for general recordkeeping requirements. Specific recordkeeping requirements for Subpart VV are listed at 40 CFR § 98.487.
When and How Must Reports Be Submitted?
Reporters must submit their annual GHGRP reports for the previous calendar year to the EPA by March 31st, unless the 31st falls on a Saturday, Sunday, or federal holiday, in which case reports are due on the next business day. Annual reports must be submitted electronically using the electronic Greenhouse Gas Reporting Tool (e-GGRT), the GHGRP’s online reporting system.
Additional information on setting up user accounts, registering a facility, and submitting annual reports is available on the GHGRP Help webpage.
When Can a Facility Stop Reporting?
Subpart A, § 98.2(i), which details when facilities can stop reporting, does not apply to Subpart VV. Once a CO2-EOR project becomes subject to Subpart VV, the facility must continue to comply with all requirements of Subpart VV for each year thereafter until the facility:
- Submits notification to discontinue reporting in accordance with Clause 10 of CSA/ANSI ISO 27916:19;
- Notifies the Administrator of intent to cease reporting and provide a copy of the CO2-EOR project termination documentation; and
- The CO2-EOR project terminates or is completed, which occurs when the facility:
- Ceases injection of CO2;
- Ceases production of hydrocarbons (HCs) from the project reservoir; and
- Plugs and abandons wells unless otherwise required by the appropriate regulatory authority.
For More Information
For additional information on Subpart VV, please visit the Subpart VV webpage. For additional information on the GHGRP, please visit the GHGRP website, which includes additional information sheets, data previously reported to the GHGRP, training materials, and links to Frequently Asked Questions. For questions that cannot be answered through the GHGRP website, please contact us at: [email protected].
This Information Sheet is provided solely for informational purposes. It does not replace the need to read and comply with the regulatory text contained in the rule. Rather, it is intended to help reporting facilities and suppliers understand key provisions of the GHGRP. It does not provide legal advice; have a legally binding effect; or expressly or implicitly create, expand, or limit any legal rights, obligations, responsibilities, expectations, or benefits with regard to any person or entity