Remediation and Restoration Projects for Ashtabula River AOC
Remediation and Restoration Projects for Ashtabula River AOC.
Project Title | Project Description | Date Completed | Targeted BUI(s) |
---|---|---|---|
Strategic Navigation Dredging | Under the Great Lakes Restoration Initiative, U.S. Army Corps of Engineers dredged 114,000 cubic yards of contaminated sediment from federal navigation channel in upper and lower river. | 2013 |
|
Jack’s Marine North Slip Sediment Cleanup | Under the Great Lakes Legacy Act, Ohio EPA partnered with U.S. EPA to clean up nearly 12,000 cubic yards of contaminated sediment from the river bottom and install a 6-inch sand cover. | 2013 |
|
5 ½ Slip Habitat Restoration | 3840 linear feet of habitat shelves were installed in the river, and 3.6 acres of upland habitat were created on the peninsula at the mid-point of the AOC. | 2012 |
|
Ashtabula River Navigation Dredging | U.S. Army Corps of Engineers removed 133,000 cubic yards of contaminated sediment downstream of the 5th Street Bridge, including 1.5 feet below authorized channel depth to create a cleaner sediment surface layer. | 2008 |
|
Ashtabula River Sediment Cleanup | Great Lakes Legacy Act sediment cleanup removed 497,000 cubic yards of sediment contaminated with PCBs and other contaminants. | 2007 |
|