Documents, Photos, and Graphics
- 2024 BASF North Works Draft 60% Basis of Design (full report) (pdf) (188 MB, 5/14/2024)
- Arcadis - Draft Basis of Design Report - Intermediate 60% Design Perimeter Barrier Remedy (pdf) (6.7 MB, 3/22/2024)
- Information Session: BASF North Works RCRA Cleanup (pdf)
- BASF North Works Comprehensive Interim Measure Remedy Selection (pdf)
- Resin Pre-Design Study (pdf)
- DRAFT Basis of Design Report Preliminary 30% Design Perimeter Barrier Remedy (pdf)
- BASF North Works Information Session Presentation (pdf)