Hazardous Waste Cleanup: Bingham and Taylor in Culpeper, Virginia
On this page:
- Cleanup Status
- Site Description
- Contaminants at this Facility
- Institutional/Engineer Controls
- Land Reuse
- Site Responsibility
Cleanup Status
In October 2002, Bingham & Taylor completed the on-site field activities. Slightly elevated lead concentrations were found in some surface soil samples taken in the western portion of the facility. The facility has implemented corrective measures at these locations by installing an impervious cap over these areas thereby eliminating the potential for the migration of lead in the surface soils. The concentration of contaminates in the subsurface soils, groundwater, and stream sediments were all below EPA's guidelines to protect human health and the environment.
In November 2002, EPA completed the off-site field activities. The sampling included the surface soil sampling of seven commercial properties located in close proximity to the Bingham & Taylor facility. Of the 102 composite surface soil samples collected, none exceeded the health-based limits for cadmium. Two composites exceeded the health-based limits for lead but they were not caused by activities associated with the Bingham & Taylor facility. The high levels were due to the makeup of the soils including backfilled debris, construction materials and rubble.
In September 2003, EPA Region 3 determined that the Environmental Indicator (EI) for Human Health was met and the Groundwater EI was met in January 2004.
On April 20, 2004, EPA held an informal meeting with the public, as well local politicians, to recommend that no further RCRA Corrective Action was necessary at the Bingham & Taylor facility. On October 27, 2004, a notice appeared in the Culpeper Star-Exponent soliciting comments from the public on EPA's recommendation. No comments were received during the 45-day public comment period. On December 22, 2004, EPA issued its Final Decision stating that the final remedy at the Bingham & Taylor facility consisted of a bituminous asphalt cap with institutional controls. This final remedy meets the Corrective Action objectives and is protective of human health and the environment and RCRA Corrective Action is now complete with controls at the Bingham and Taylor facility.
Site Description
Interactive Map of Bingham and Taylor, Culpeper, Virginia
View larger map
The Bingham & Taylor Foundry is located in Culpeper, Virginia and consists of two large buildings housing offices and operations, several other outbuildings for storage and a loading dock. The foundry produces cast iron products from recycled scrap iron. Scrap iron is delivered by truck, melted in the cupola, and the molten iron is transferred by ladles to various molds to produce cast products. The castings are then immersed into a dip tank for finishing with an asphalt coating.
Contaminants at this Facility
Based on available information there are no known imminent threats to human health or the environment from the Bingham and Taylor Facility. The main contaminants of concern were lead and cadmium.
Institutional and Engineering Controls at this Facility
Institutional controls are a notice in the property deed which includes the location of the bituminous asphalt cap or materials management areas.
Land Reuse Information at this Facility
The facility is under continued use.
Site Responsibility at this Facility
RCRA Corrective Action activities at this facility are being conducted under the direction of the Virginia Department of Environmental Quality with assistance from the EPA Region 3.