Northeast Church Rock Mine: Technical Reports
Technical Reports related to the cleanup progress of the Northeast Church Rock Mine (NECR).
- NECR 95 Percent Design Drawings Volume 2 (pdf)
- NECR Consolidation and Groundwater Analysis Report (DRAFT) (pdf)
- NECR Design Report Volume 1 with Appendix A-H (PDF) (33.2 MB, October 2017)
EPA-approved design for the Northeast Church Rock Mine Site Waste Repository on the United Nuclear Corporation Mill Site which was in the United Nuclear Corporation (UNC) Mill license amendment request that UNC/General Electric submitted to the Nuclear Regulatory Commission. The design will be 100% complete upon approval by the NRC and included with the construction bid documents.- NECR Design Report Volume 1 Appendix I Mill Site Stormwater Controls (PDF) (418pp, 35.3MB, October 2017)
Appendix I: Mill Site Stormwater Controls for EPA-approved design documents for the Northeast Church Rock Mine Site Waste Repository on the United Nuclear Corporation Mill Site.
- NECR Design Report Volume 1 Appendix J to X Technical Specifications (PDF) (897pp, 23.6MB, October 2017)
Appendix J to X: EPA-approved design documents for the Northeast Church Rock Mine Site Waste Repository on the United Nuclear Corporation Mill Site.
- NECR Design Report Volume 1 Appendix I Mill Site Stormwater Controls (PDF) (418pp, 35.3MB, October 2017)
- Additional Documents