This page contains technical reports related to the cleanup of Ruby Mines including: Removal Site Evaluation (RSE) Reports, RSE Appendices, and Work Plans.
Free viewers and readers are available to access documents on our website. If you encounter issues with assistive technology, please contact us.
-
Ruby Mines Removal Site Evaluation Report (pdf)
(13.58 MB, November 2015)
This Removal Site Evaluation (RSE) Report describes three phases of activities performed to initially fence and close open mine features and summarizes the results of investigations conducted to characterize chemical and radiological conditions at the Ruby Mines Site. -
Ruby Mines Removal Site Evaluation Report Appendices (pdf)
(39.28 MB, November 2015)
Appendices to the Ruby Mines Removal Site Evaluation Report -
Ruby Mines Phase 3 Removal Site Evaluation Work Plan (pdf)
(8.62 MB, 09/23/2014)
This work plan describes activities to be performed for environmental characterization at the Ruby Mines Site. -
Ruby Mines Phase 2 Work Plan Transect Gamma Scan and Background Study (pdf)
(8.62 MB, October 2013)
This work plan describes activities to be performed for radiological surveys and background screening at the Ruby Mines Site. -
Ruby Mines Phase 1 Removal Site Evaluation Work Plan (pdf)
(6.08 MB, August 2013)
This work plan describes activities to maintain temporary fencing placed around two adits and two vent holes, close adits and vent holes, and post warning signs at the former Ruby Mines Site.