BP Cherry Point Cogeneration Project - Permitting Information
1. Facility Information
BP Cherry Point Cogeneration Project
2. Location
Northwestern Whatcom County, 7 miles southeast of Blaine, Washington.
3. Distance from US/Canada Border
8 miles
4. Facility Type and Size
The proposed 750 megawatt cogeneration project will be located adjacent to the existing BP Cherry Point petroleum refinery. BP proposes to construct three GE 7FA combustion turbines in combined-cycle mode. Each heat recovery steam generator (HRSG) will be equipped with a duct burner. One common steam turbine and electric generator will serve all three power trains. Steam and electricity from the cogeneration project will be provided to the refinery.
5. Sources of Emissions
Combustion turbines and HRSG duct burners.
6. Type of Fuel
Natural gas
7. Type and Quantity of Emissions & 8. Emission Control Technology
According to BP, "Total air criteria pollutants emitted by the Cogeneration Project will be completely offset by corresponding reductions in emission from the refinery made possible, in part, by the steam and electricity provided to the refinery by the Cogeneration Project."
The estimated annual emissions considering controls for the three new emission units:
Pollutant | Quantity of Emissions (tons / yr) |
Emission Control Technology |
---|---|---|
PM10 | 273 | Pipeline natural gas & good combustion practices |
SO2 | 54 | Pipeline natural gas & good combustion practices |
NOx | 228 | Pipeline natural gas, good combustion practices, dry low-NOx combustors, & SCR |
VOC | 37 | Pipeline natural gas, good combustion practices, oxidation catalyst |
CO | 116 | Pipeline natural gas, good combustion practices, oxidation catalyst |
H2SO4 | 18 | Pipeline natural gas & good combustion practices |
HAP | 6 | Pipeline natural gas, good combustion practices, oxidation catalyst |
9. Date Permit Application Received
June 19, 2002.
10. Stack Height and Diameter
Stack 1:
Height: 150 feet
Diameter: 19 feet
Stack 2:
Height: 150 feet
Diameter: 19 feet
Stack 3:
Height: 150 feet
Diameter: 19 feet
11. Permit Agency Contact
State of Washington Energy Facility Site Evaluation Council
Attn: Michelle Elling
P.O. Box 43172
Olympia, WA 98504-3172
Phone: 360.956.2124