WIPP Interim Ventilation System (IVS) Approval Documents
Correspondence between EPA and DOE regarding the interim and supplemental ventilation systems, as well as the inspection report from April 2016, can be found below in Adobe (PDF) format.
Enclosure 1: DOE's Responses to EPA Comments (pdf)
Enclosure 2: UVFS Alarm Response (pdf)
Enclosure 3: Air Sampling Equipment (pdf)
Enclosure 4: Station B Canberra iCAM Alpha Continuous Air Monitor (pdf)
Enclosure 5: UVFS Airborne Radioactivity (pdf)
Attachment A: Testing Schedule (pdf)
Attachment B: Station B Stack COV Testing of IVS & SVS (pdf)