UIC Class III In-Situ Production of Copper Permit No. R9UIC-AZ3-FY11-1: Florence Copper Project, Florence, AZ
This permit was originally issued on December 20, 2016, and was subsequently appealed to the Environmental Appeals Board (EAB) for review under 40 CFR 124.19. The permit was stayed pending review by the EAB. After review of briefs filed in the appeal and oral argument, the EAB issued an order denying the petitions for review of the permit on September 22, 2017.
If you experience a problem reading a document with assistive technology, please contact us.
- Notice of Final Permit Decision: Florence Copper Production Test Facility - September 29, 2017 (pdf)
- Minor Permit Modification: Florence Copper Inc. (pdf)
- Minor Permit Modification: Florence Copper Inc (pdf)
- Minor Permit Modification: Florence Copper Inc. (pdf)
- Notice of Final Permit Decision: Florence Copper Production Test Facility - September 29, 2017 (pdf)
- Notice of Final Permit Decision: Florence Copper Production Test Facility - December 20, 2016 (pdf)
- UIC Area Permit No. R9UIC-AZ3-FY11-1: Class III In-Situ Production of Copper - Florence Copper, Inc. (pdf)
- APPENDIX A: Project Maps, Aquifer Exemption Delineation, and Well Locations (pdf)
- APPENDIX B: Proposed Well Construction Procedures and Diagrams (pdf)
- APPENDIX C: Plugging and Abandonment Plan (pdf)
- APPENDIX D – Geophysical Logging Requirements (pdf)
- APPENDIX E: Operations Plan (pdf)
- APPENDIX F: Closure and Post-Closure Plans (pdf)
- APPENDIX G: Memorandum of Agreement on Historical Preservation (pdf)
- APPENDIX H: Wildlife Monitoring Plan (pdf)
- APPENDIX I: EPA Reporting Forms (pdf)
- APPENDIX J: Region 9 Step Rate Test Policy (pdf)
- APPENDIX K: Groundwater Quality Alert Levels and Compliance Monitoring (pdf)
- Response to Comments: Florence Copper Production Test Facility (pdf)
- Response to Comments: NHPA Section 106 Consultation proposed Florence Copper Project Production Test Facility (pdf)