Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 38 results
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
Can MOVES Report Output in Terms of Fuel Consumption?
See More Frequent Questions about MOVES and Related Models . Although gallons of fuel consumed are not reported by MOVES, the factors used to convert total energy consumption (a MOVES reporting option) to gallons of fuel are contained in the FuelSubtype table (energy content, reported in kilojoules per gram of…
- Last published:
-
Why Doesn't my Output Vehicle Miles Traveled (VMT) Match my Input VMT?
See More Frequent Questions about MOVES and Related Models . This problem usually occurs when the run specification does not include all possible vehicle and fuel types. MOVES internally allocates the input VMT to each of the source types and fuel types and only reports the VMT for the fuel…
- Last published:
-
How do I use MOVES at Project Scale?
See More Frequent Questions about MOVES and Related Models . The MOVES model can estimate emissions at national, county or project scale. Project scale is useful for estimating an individual transportation project like an intersection or transit project, but it requires detailed inputs that describing the vehicle population and activity…
- Last published:
-
How Can I Determine the Effect of Speed on Vehicle Emissions?
See More Frequent Questions about MOVES and Related Models . MOVES can be run in either “Inventory” or “Emission Rates” mode. With Emission Rates, MOVES reports emission rates for the 16 average speed bins used by MOVES for each hour of the day and additional emission rate output that may…
- Last published:
-
What does MOVES Assume for Future Year Fleet Fuel Efficiency and Emissions?
See More Frequent Questions about MOVES and Related Models . MOVES reflects all fuel economy and emissions standards that were final as of the model release date. For a list of recent regulations accounted for in the most recent MOVES version, see the see the Overview of EPA’s Motor Vehicle…
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published:
-
Does MOVES Incorporate Anticipated Improvements in VOC Emission Factors Resulting from Improved Fuel Economy?
See More Frequent Questions about MOVES and Related Models . Changes in fuel consumption affect VOC emissions by reducing refueling vapor losses and spillage. Other emissions (such as sulfates) are also affected by fuel consumption. MOVES incorporates changes due to fuel economy requirements that were finalized as of the date…
- Last published:
-
Can I use MOVES to Model Emissions from Vehicles in other Countries?
See More Frequent Questions about MOVES and Related Models . The MOVES model was designed specifically to model the emissions from vehicles and equipment designed to meet emission standards in the United States. There are considerable challenges to adapting the MOVES framework to other nations, primarily around the need for…
- Last published:
-
How can I run MOVES3 for the entire U.S or for an entire year?
See More Frequent Questions about MOVES and Related Models . The most accurate national MOVES runs are done for every county and hour and then averaged together in the output, but, depending on your intended use of the results, it’s also possible to pre-aggregate the MOVES inputs to run the…
- Last published:
-
How does MOVES Calculate CO2 and CO2 Equivalent Emissions?
See More Frequent Questions about MOVES and Related Models . MOVES calculates the energy it takes to operate an onroad vehicle based on energy consumption rates as explained in the technical reports Greenhouse Gas and Energy Consumption Rates for Onroad Vehicles MOVES3 (pdf) (November 2020, EPA-420-R-20-015) and Exhaust Emission Rates…
- Last published:
-
Elements to include in Facility Response Plan
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…
- Last published:
-
What are the FRP recordkeeping requirements?
What FRP recordkeeping requirements must I satisfy? You must maintain the response plan at your facility, along with plan updates reflecting material changes. You must also keep a log of response training drills and exercises. Records of inspections of response equipment must be kept for five years. If you determine…
- Last published:
-
Under FRP, what is the definition of a qualified individual?
The FRP regulations require facilities to prepare an emergency response action plan and identify a qualified individual that has full authority, including contracting authority, to implement removal actions (40 CFR §112.20(h)(i)). What is the definition of a qualified individual? The relevant statute, CWA 311(j)(5)(C)(ii) requires that the plan identify the…
- Last published: