Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Recordkeeping and Reporting Requirements Total results: 6
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Recordkeeping and Reporting Requirements
- Modeling Nonroad Equipment
- 112.8 Specific Onshore Requirements (Excluding Production)
Displaying 1 - 15 of 16 results
-
How do the changes in the 2006 Amendments apply to mobile refuelers?
Mobile refuelers are now exempt from the following sized secondary containment provisions that still apply to all other bulk storage containers and mobile/portable bulk storage containers: • Sections 112.8(c)(2) and (11) for petroleum oils • Sections 112.12(c)(2) and (11) for animal fats and vegetable oils These provisions previously required sized…
- Last published:
-
How Can I Reduce the Time Needed to Run the Nonroad Emission Factor Post-Processing Scripts?
See More Frequent Questions about MOVES and Related Models . Very long run times are not unusual for Nonroad emission factor post-processing scripts, particularly with a large output database. To reduce script run time, we recommend doing the following: Reduce the size of your output database by choosing just the…
- Last published:
-
If a certified renovator is an employee of the certified firm, can the firm maintain all required records (those required of the firm and of the certified renovator); understanding that the certified renovator must also keep a copy of his certification as well as employee training records/documentation on the jobsite?
Answer: The renovation firm is the entity responsible for retaining and making available to EPA all records necessary to demonstrate compliance with the RRP Rule for a period of three years following completion of the renovation. The certified renovator is responsible for preparing the records demonstrating that the renovation was…
- Last published:
-
SPCC Rule schedules for inspections, tests, and evaluations
The SPCC rule requires inspections, tests, and evaluations of above ground containers (40 CFR §112.8(c)(6)). Does the rule set schedules for how often these need to be conducted? The SPCC Rule does not prescribe a specific frequency or methodology for performing the required inspections, evaluations, and tests for aboveground containers…
- Last published:
-
How Do I get Carbon Dioxide Equivalent (CO2e) Results for Nonroad Equipment?
See More Frequent Questions about MOVES and Related Models . CO2e is simply the combination of the pollutants that contribute to climate change adjusted using their global warming potential. This can be done manually summing the mass of the pollutants multiplied by their global warming potential factors. These are the…
- Last published:
-
How Do I Get Emission Factors or Inventory Totals for Nonroad Equipment Aggregated by the Various Categories used by MOVES?
See More Frequent Questions about MOVES and Related Models . We have included a set of post-processing scripts that take the results of a Nonroad run and generate other output options. These scripts are all available in the MOVES graphical user interface in the Post Processing pull-down menu under “Run…
- Last published:
-
Under the RRP Rule, can the required records and documentation be stored electronically rather than as paper copies?
Answer: Yes. The renovation firm is responsible for retaining and making available to EPA all records necessary to demonstrate compliance with the Lead Renovation, Repair, and Painting (RRP) Rule for a period of three years following completion of the renovation. The RRP Rule does not specify the format in which…
- Last published:
-
Are mobile refuelers exempt from integrity testing requirements?
Pursuant to 40 CFR §112.8(c)(2), mobile refuelers are exempt from the secondary containment requirements for bulk storage containers. Are mobile refuelers also exempt from the requirements for integrity testing in §112.8(c)(6)? Since mobile refuelers are mobile or portable bulk storage containers, the other provisions of §112.8(c) still apply. Therefore, mobile…
- Last published:
-
How Can I Incorporate Local Data Into My MOVES-Nonroad Run?
See More Frequent Questions about MOVES and Related Models . We recommend not modifying the internal tables of the MOVES-Nonroad model to incorporate local data, as this can lead to unintended consequences. Instead, you can apply local activity and population data by: Executing a nonroad run in Inventory mode for…
- Last published:
-
Under the RRP Rule, can the certified renovator comply with the rules by keeping records regarding his certification and employee training electronically, provided he can display them on a hand held device or laptop on the job site?
Yes. The Lead Renovation, Repair, and Painting (RRP) Rule does not specify the format in which these documents must be kept, but they must be available at the work site. Documents are not available if they cannot be viewed. Certified renovators must have with them at the work site copies…
- Last published:
-
Can N2O (nitrous oxide) Emissions be Estimated in the MOVES Nonroad Model?
See More Frequent Questions about MOVES and Related Models . Nitrous oxide (N2O) results is not an option you can select for nonroad equipment in MOVES.
- Last published:
-
If a general contractor and one or more subcontractors are involved in a single renovation project, which persons or entities are responsible for preparing, retaining and making available the necessary records?
Answer: The certified renovator, whether assigned by a general contractor or subcontractor, is responsible for preparing the records demonstrating that the renovation was conducted in compliance with the work practice standards, including training provided to non-certified workers. All renovation firms involved in a project share the responsibility for retaining and…
- Last published:
-
Why in my Nonroad Results do I Have a fuelTypeID not Listed in the FuelType Table?
See More Frequent Questions about MOVES and Related Models . The fuel types used by the nonroad part of MOVES is not located in the FuelType table. If you look in the NRFuelType table you will see that 23 is for nonroad diesel fuel and 24 is for marine diesel…
- Last published:
-
How can I Install the NONROAD Model?
See More Frequent Questions about MOVES and Related Models . EPA no longer supports the stand-alone FORTRAN version of the NONROAD model. It likely would need to be recompiled for use in current versions of the Windows operating system. Instead, EPA has included Nonroad equipment estimates in our current MOVES…
- Last published:
-
What records must a subcontractor keep?
Answer: If the certified renovator assigned to the project is assigned by the subcontractor, the certified renovator is responsible for preparing the records demonstrating that the renovation was conducted in compliance with the work practice standards, including training provided to non-certified workers. All renovation firms involved in a project share…
- Last published: