Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Water Management Update Total results: 9
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Grandfathering Total results: 8
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 41 results
-
Are organizations located outside of the Great Lakes region eligible to apply for this RFA?
Your organization could be eligible. Applicants must meet the eligibility criteria outlined in Section III.A., B., & C. of the RFA in order to apply. Only applications from eligible entities that meet the threshold eligibility requirements will be considered. Applicants should carefully review all threshold eligibility requirements. Applicant eligibility information…
- Last published:
-
Can foreign governments or private entities apply?
No. From page 21 of the RFA: Qualified non-federal entities eligible to apply for grants include non-federal governmental entities: State agencies; any agency or instrumentality of local government; interstate agencies; and federally recognized tribes and tribal organizations. Institutions of Higher Education and non-profit organizations are also eligible to apply. Non-profit…
- Last published:
-
How will the volume of corn ethanol produced above the grandfathering threshold be treated?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . For grandfathered facilities, only the baseline volumes are exempt from the 20 percent GHG reduction requirement Thus, RINs may be generated for baseline volumes of fuel regardless of lifecycle greenhouse gas emissions performance. Volumes of fuel produced above…
- Last published:
-
Do grandfathered facilities have an additional 6 months to submit their engineering reviews to EPA?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. In the preamble to the final RFS2 regulations at 75 Fed. Regs. 14709 (March 26, 2010), EPA stated that, in an effort to reduce demand on engineering resources in the interim between promulgation of the rule and…
- Last published:
-
What is meant by "grandfathered" fuel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under the RFS2 regulations, renewable fuel produced from facilities that commenced construction before December 19, 2007 and which completed construction within 36 months without an 18 month hiatus in construction and thereby exempt from the minimum 20% GHG…
- Last published:
-
How long will the grandfathering provision be effective? Once a grandfathered producer registers and completes their engineering review, will their baseline volume ever need to meet the 20% GHG reduction requirement?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If a facility meets the requirements for exemption from the 20% GHG reduction requirement pursuant to 40 CFR 80.1403(c ) or (d), then the baseline volume of renewable fuel produced by that facility is exempt from the 20%…
- Last published:
-
Applications focused solely on applications on improving access, recreational, and workforce development activities are prohibited, but may a PR propose a project that solely focuses on these activities?
No, subawards focused solely on those things are also not eligible. From page 10: Note: Subawards may also include activities that improve communities’ access and enjoyment of restored areas, provided they are a part of and enhance an eligible project that accomplishes and is directly related to one of the…
- Last published:
-
Would surveying or similar human subject research be allowable as a component of a PG’s application or is any such research expressly prohibited?
Human subjects research and surveys could be eligible activities, provided they are part of a project that otherwise meets the eligibility requirements stated in the RFA. Applicants and potential subawardees should be advised that those activities are subject to the human subjects research and Paperwork Reduction Act review processes, which…
- Last published:
-
Are projects located in Lake Champlain eligible for funding?
Projects located in Lake Champlain are not within the eligible geographic bounds. Proposed GLEJGPs must be implemented within the historic Great Lakes Basin, including projects impacting connecting waterways such as the U.S. portions of the St. Mary’s River, Lake St. Clair and the St. Lawrence River (at or upstream from…
- Last published:
-
Is this grant eligible to all of Ohio or only portions of Ohio within the Great Lake's watershed.
Proposed projects must be implemented within the historic Great Lakes Basin , including projects impacting connecting waterways such as the U.S. portions of the St. Mary’s River, Lake St. Clair and the St. Lawrence River (at or upstream from the point at which the St. Lawrence River becomes the international…
- Last published:
-
What does the reporting look like? Will the PR have to report back on the impact of all grantees funded, and if so, how often will this be required?
Yes, reporting will be required. EPA will help facilitate the reporting process, but we will be looking for reporting from the principal recipient on all sub awarded projects and the impacts that that have that those projects have had, as well as all final reports.
- Last published:
-
Will there be an increase in turbidity (cloudiness or muddiness) or silt in the streams?
The increased flow from this work is expected to be minimal and should not impact turbidity or silt.
- Last published:
-
Will returning the natural flow of water to Sulphur Run disturb areas with sheen?
Conditions in the streams are much improved because of previous cleanup work conducted in 2023. Although oily sheens remain, they are settled in the sediment and do not impact surface water unless disturbed. The increased water flow to Sulphur Run will be minimal and is not expected to disturb sheen…
- Last published:
-
How does a foreign grandfathered renewable fuel production facility processing a mixture of feedstocks with different D codes or no D codes classify its production into D code categories so RINs can be generated when the product is imported into the U.S.?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If the importer is generating the RINs, the importer must obtain all the required information for registration from the foreign producer of the renewable fuel pursuant to 80.1426(a)(2) and 80.1450. In the case of a foreign producer using…
- Last published:
-
We can see our proposal working well as a regional or basin wide proposal. Is there any issue with submitting for both?
You could submit two applications, one for regional and one for basin-wide (if selected, we would only fund one GLEJGP). Additionally, you could choose to submit only basin-wide. You may be selected for the full proposal or depending on programmatic needs we might work with your program to focus on…
- Last published: